Time for some underground utility work! They are running the water and sewer pipes, prepping the crawlspace for the radon mitigation, setting the grade for the garage-mahal floors, and tuning up the dirt around the perimeter of the house.
You can really see the outline of the house now - with the light tan gravel spread over the crawlspace floor (preparing to pour the concrete slab). They also dug the trench for the sewer pipe - which they have to leave ‘open’ until the pipe and connections pass inspection.
Our builder hopes to pour the crawlspace and garage floors next week - before Thanksgiving - so they can cure over the long holiday weekend. Praying things dry up a bit after the rain and SNOW we’ve gotten this past week.